A Porta Potty Plan for Large Job Sites
Pad maps, unit ratios, split clusters, and service days for multi-crew construction sites across Prince George's County, Washington DC, and Montgomery County.
· 7 min read

A large site without a sanitation plan gets the same three failures: too few units, one unreachable cluster, and a vendor who cannot prove they were there. Write the plan before the first trailer hits the gate.
Draw the pad map

- Each cluster: unit count, ADA, hand-wash, service-lane approach
- Walking time from the furthest workface at peak headcount
- Where the vacuum truck turns around without stopping the crane
Ratio, then reality
Start near 1 standard unit per 10 workers on one shift. A second shift is another set of units or a second pump-out that week. Use the shift grid, then add for overtime and heat. That ratio is tighter than OSHA Table D-1 on purpose: inspectors and owners walk the pad. Undersizing is visible.
Lock the weekday